swr_percmicro.f90 Source File


This file depends on

sourcefile~~swr_percmicro.f90~~EfferentGraph sourcefile~swr_percmicro.f90 swr_percmicro.f90 sourcefile~hru_module.f90 hru_module.f90 sourcefile~swr_percmicro.f90->sourcefile~hru_module.f90 sourcefile~septic_data_module.f90 septic_data_module.f90 sourcefile~swr_percmicro.f90->sourcefile~septic_data_module.f90 sourcefile~soil_module.f90 soil_module.f90 sourcefile~swr_percmicro.f90->sourcefile~soil_module.f90 sourcefile~carbon_module.f90 carbon_module.f90 sourcefile~soil_module.f90->sourcefile~carbon_module.f90

Source Code

      subroutine swr_percmicro(ly1)

!!    ~ ~ ~ PURPOSE ~ ~ ~
!!    this subroutine computes percolation and lateral subsurface flow
!!    from a soil layer when field capacity is exceeded

!!    ~ ~ ~ INCOMING VARIABLES ~ ~ ~
!!    name         |units         |definition
!!    ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
!!    ihru         |none          |HRU number
!!    slsoil(:)    |m             |slope length for lateral subsurface flow
!!    sw_excess    |mm H2O        |amount of water in soil that exceeds field 
!!                                |capacity (gravity drained water)
!!    tdrain(:)    |hrs           |time to drain soil to field capacity
!!    ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

!!    ~ ~ ~ OUTGOING VARIABLES ~ ~ ~
!!    name         |units         |definition
!!    ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
!!    lyrtile      |mm H2O        |drainage tile flow in layer for day in HRU
!!    sepday       |mm H2O        |percolation from soil layer
!!    ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

!!    ~ ~ ~ LOCAL DEFINITIONS ~ ~ ~
!!    name         |units         |definition
!!    ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
!!    ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

!!    ~ ~ ~ SUBROUTINES/FUNCTIONS CALLED ~ ~ ~
!!    Intrinsic: Exp

!!    ~ ~ ~ ~ ~ ~ END SPECIFICATIONS ~ ~ ~ ~ ~ ~

      use septic_data_module
      use hru_module, only : hru, ihru, bz_perc, i_sep, isep, latlyr, lyrtile, sepday, sw_excess
      use soil_module
      
      implicit none
      
      integer, intent (in) :: ly1     !none          |soil layer number
      integer :: j = 0                !none          |HRU number
      real :: ho = 0.                 !none          |variable to hold intermediate calculation
                                      !              |result
      real :: ratio = 0.              !none          |ratio of seepage to (latq + sepday)
      real :: sol_k_sep = 0.          !              |

      j = ihru

      !! if temperature of layer is 0 degrees C or below
      !! there is no water flow
      if (soil(j)%phys(ly1)%tmp <= 0.) then
        sepday = 0.
        return
      end if

        !! COMPUTE LATERAL FLOW USING HILLSLOPE STORAGE METHOD
        if (soil(j)%phys(ly1)%ul - soil(j)%phys(ly1)%fc <= 0.) then
          ho = 0.
        else
          ho = 2. * sw_excess / ((soil(j)%phys(ly1)%ul - soil(j)%phys(ly1)%fc) / soil(j)%phys(ly1)%thick)
        end if
        if (ly1 == 1) then
          latlyr = 0.
        else
          latlyr = hru(j)%hyd%latq_co * ho * soil(j)%phys(ly1)%k * hru(j)%topo%slope / hru(j)%topo%lat_len * .024
        end if
        
      if (latlyr < 0.) latlyr = 0. 
      if (latlyr > sw_excess) latlyr = sw_excess

      soil(j)%phys(ly1)%hk = (soil(j)%phys(ly1)%ul - soil(j)%phys(ly1)%fc) / soil(j)%phys(ly1)%k

      !! septic changes 1/28/09 
      if (ly1 == i_sep(j)) then
         if (sep(isep)%opt  == 1) then !active system
           sol_k_sep = soil(j)%phys(ly1)%k * (soil(j)%phys(ly1)%st - soil(j)%phys(ly1)%fc) /     &
                                              (soil(j)%phys(ly1)%ul - soil(j)%phys(ly1)%fc)
           sol_k_sep = Max(1.e-6, sol_k_sep)
           sol_k_sep = Min(soil(j)%phys(ly1)%k, sol_k_sep)
           soil(j)%phys(ly1)%hk = (soil(j)%phys(ly1)%hk - soil(j)%phys(ly1)%fc) / sol_k_sep
         
         elseif (sep(isep)%opt  == 2) then !failing system
           soil(j)%phys(ly1)%hk = 1.e10
         endif
      endif 
      !!  septic changes 1/28/09
      
      soil(j)%phys(ly1)%hk = Max(2., soil(j)%phys(ly1)%hk)

      !! compute seepage to the next layer
      sepday = (soil(j)%phys(ly1)%st - soil(j)%phys(ly1)%fc) * (1. - Exp(-24. / soil(j)%phys(ly1)%hk))
      sepday = Max(0., sepday)
      
      !! limit maximum seepage from biozone layer below potential perc amount
      if(ly1 == i_sep(j).and.sep(isep)%opt ==1) then
        sepday = min(sepday,sol_k_sep *24.)
        bz_perc(j) = sepday
      end if
      
      !! switched to linear relationship for dep_imp and seepage
      if (ly1 == soil(j)%nly) then
        sepday = sepday * hru(j)%hyd%perco_lim
      end if

      !! check mass balance
      if (sepday + latlyr > sw_excess) then
        ratio = sepday / (latlyr + sepday)
        sepday = sw_excess * ratio
        latlyr = sw_excess * (1. - ratio)
      endif
      if (sepday + lyrtile > sw_excess) then
        sepday = sw_excess - lyrtile
      endif

      return
      end subroutine swr_percmicro